Dredging Systems have been maintaining the pump inlet pond for Orora since 2012.
The site is located in an industrial zone has very tight access for equipment.
Approx. 2000 tonnes of floating weed, sediment and rubbish is removed, dried and transported off site each year.
By keeping the ponds clean, the factory is able to pump water 24 hrs a day.